Daily logs /
A design reference for the CRD
The retained continuity record dates the CRD design-reference approval to October 26, with production gates still separate.
Record date Oct 26, 2026 · Published
The retained visual continuity guide records October 26 approval of the CRD design reference. Its distinguishing features include a khaki cargo body, blue screen face, two manipulator arms, four angled hover pads and side storage.
That was approval of a visual design reference. It did not validate physical hovering, carrying capacity, unseen geometry, a production rig or an animated equipment handoff. Later shared scenes still needed their own contact and scale review.