RC–01 Recon Chinchilla
RC-01 / Engineering archive

Engineer’s
Corner.

Inside the build: the architecture, code, hardware and experiments behind Ash.

Archive updated November 1, 2026 · Dated reports retain their individual evidence cutoffs

The mechanism. The measurement. The lesson.

Follow the project from its first dated record on September 16. Each report keeps demonstrated work, failed experiments and future designs visible. The original source book and raw evidence remain private.

Start with the system

One character.
Several working layers.

See how perception, state, behavior, voice and the public world fit together—and which connections still need to be built.

Explore the architecture →
  1. 01Pi benchPerception → state → behavior
  2. 02Voice developmentListen → validate → reply → speak
  3. 03Browser worldAnimation, scenes and ambience

The build, week by week

19 reports
Engineering update / November 1, 2026

Ash’s voice: identity, validation, and the remaining wait

What was deployed, which responses were prepared, what the model actually generated, and why a successful turn still felt slow.

Read the engineering report
Engineering update / October 30, 2026

Visual continuity needs an approval record

Approved references, still contact and an informational guide solved different production problems.

Read the engineering report
Engineering report / October 25–29, 2026

An execution failure without an established cause

Preserve the difference between readable files, earlier renders, owner actions and the later agent launch failure.

Read the engineering report
Engineering report / October 24, 2026

File integrity is only one recovery gate

The snapshot, retained exceptions and narrow dependency restore had measurable outcomes; application recovery remained open.

Read the engineering report
Engineering report / October 21–24, 2026

Readable motion needs more than clean geometry

Service contact, droid modeling and the DDS–Ash letter review exposed different kinds of failure.

Read the engineering report
Engineering update / October 16, 2026

When Account Recovery Interrupts Engineering

An unresolved OpenAI access disruption, its impact on RC-01 development, and the continuity lessons we are carrying forward.

Read the engineering report
Engineering update / October 16, 2026

From character design to readable motion

Gigi joins the Recon Chinchilla world while short, controlled animation studies test whether expressions remain clear in motion.

Read the engineering report
Integration readiness / October 12, 2026

What the next RC-01 checks need to establish

Approved paper criteria define the next checks. New qualification cases remain unrun, with hardware and powered testing on hold.

Read the engineering report
Paper direction approved / Proposed details / October 12, 2026

Physical Ash: measure before building

The stationary service-chassis direction is approved on paper. Exact design, compatibility and G0–G7 remain open; no hardware changes or powered testing are authorized.

Read the engineering report
01 / September 14–20, 2026

The bench before the robot

The first dated project record begins September 16. This week established the physical bench and the records needed to tell an installed component from a working subsystem.

Read the engineering report
02 / September 21–27, 2026

From pixels to a managed presence signal

Camera and accelerator bring-up exposed two separate cable problems. The larger software lesson was to turn a frame’s detections into one decision before updating presence state.

Read the engineering report
03 / September 28–October 4, 2026

State, recovery and the first native audio contract

The architecture gained explicit state and behavior services. The most important correction was to stop treating recovered history as a new live event. Native audio then gained stable event identity without changing its accepted segmentation.

Read the engineering report
04 / October 5–11, 2026 · through October 10

Voice, character and a public engineering surface

The current week joined a public website, a more convincing coffee animation, local voice trials and the approved Michael voice. It also produced clearer boundaries around what Ash knows and what is still only designed.

Read the engineering report
Weekend / October 9–12, 2026

Weekend Engineering Review October 9 to 11 2026

Voice selection, bounded demonstrations, failures and open validation gates.

Read the engineering report
Weekend / October 9–12, 2026

When Progress Stops

A historical pause, a subsequent owner release, and the validation still required.

Read the engineering report
Weekend / October 9–12, 2026

Controlled voice regression after freeze release

Proposed procedure — NOT RUN. Freeze released; live validation and acceptance remain open.

Read the engineering report
Characters / October 12, 2026

The Command Center cast

Approved appearances, reference assets and the production work still open.

Read the engineering report
Animation and features / October 12, 2026

Animation, features and open tests

The approved CODD website routine, isolated pilot evidence, DDS requirements and seasonal design intent.

Read the engineering report
Documentation / October 12, 2026

Weekend documentation and acceptance register

Public weekend addendum and acceptance register. The private Project Book continuation is complete as edition 1.14; operational validation remains open.

Read the engineering report