RC–01 Recon Chinchilla
All of Engineer’s Corner
Documentation / October 12, 2026

Weekend documentation and acceptance register

Public weekend addendum and acceptance register. The private Project Book continuation is complete as edition 1.14; operational validation remains open.

Published 2026-10-12 · Dated evidence, not a live status feed

Current documentation status, October 12

The private Project Book continuation is complete as content edition 1.14. Earlier pending-merge wording is superseded by this documentary result. Completing the record does not close operational validation, hardware, voice or integration acceptance gates.

Runtime release and custody

The owner released the runtime change freeze on October 12, 2026. That release permits resumed development; it does not turn open validation into acceptance. This website update performs no device or speech work.

The October 11 evidence cutoff remains unchanged. This public addendum adds no new hardware inspection, fresh voice test or rig integration. The private Project Book continuation is complete as edition 1.14; operational validation remains open.

Current disposition

Record: RC01-DOC-20261012-WEEKEND-01. Parent authority: Project Book v1.9, Section 22 and its October 11 13:43 EDT cutoff. This addendum adds creative and public-reporting records. It does not rename the parent as v1.10, merge competing historical branches, alter procurement or change the installed baseline.

ItemControlled dispositionNext evidence
Michael 1.15Voice and pacing acceptedPreserve during separately approved live regression
Piper v12 and Michael candidateCoexisting routes; everyday designation unresolvedOwner baseline decision
Writer correctionImplemented and hash verified; live validation openFull listener and same-turn integration evidence
Candidate suiteHistorical 139-pass full suiteFresh full-suite result only if run and retained
Later Eagles/non-speech repairsFocused checks and replay passedFresh native microphone regression
Physical speaker/XVF3800Current configuration and firmware readiness unverifiedPhysical mapping and separate hardware qualification
Truthfulness/PMAGeneral acceptance openFresh spontaneous cases and user judgment
Persistent memory/wake word/barge-inNot establishedSeparate design and acceptance work
DDSDesign recorded; implementation not doneBounded isolated prototype; production acceptance remains open
Eleanor/Dr JennyReference sheets producedAsset review, animation production and runtime evidence
Bishop seasonal missionConcept capturedOriginal pilot and subsequent decisions
Website publicationThis public content updateNative deployment confirmation is recorded separately
Project Book mergeCompleted as content edition 1.14Historical evidence preserved; operational validation and acceptance remain open.