RC–01 Recon Chinchilla
All daily logs
Daily logs /

Reference art with scoped approval

Bishop and the Unknown Engineer gained approved references, while a continuity guide kept design authority separate from production readiness.

Record date Oct 30, 2026 · Published

Bishop’s reference sheet and the Unknown Engineer’s reference sheet received owner approval. The Engineer’s revised PMA and friendly technology backpack patches were subsequently accepted. Their existing faces, outfits and poses stayed within the scoped revision.

A four-page visual continuity guide brought together seven chinchillas and five droid types. It documented distinguishing features and conflicting incidental portrayals. Its independently sized previews were not an approved height chart, unseen-geometry definition or rig certificate.

A closed-laptop contact study between the Unknown Engineer and a CRD was accepted as an interaction study. Shared support, receipt and release were reviewed as still poses; no completed handoff animation or absolute scale approval was implied.